Concrete Pump Truck in The Construction Of The Correct Process
Dec 15, 2022

  The concrete pump truck is widely used in the construction site, which greatly improves the quality and efficiency of the construction, but various problems will appear during the use of the pump truck, which will affect the normal work, therefore, the operators of the pump truck must understand the various common faults of the pump truck and the treatment methods, and strictly follow the construction process of the pump truck to operate, here to give you a concrete pump truck in the construction of the correct process is how:

  1 concrete pump truck chassis take force operation flow

  Driving pump switch should be completed in the cab, before the operation should be put into neutral to pull the handbrake, press the power switch. After taking the force to complete, and then put into the corresponding gear, generally hang 1:1 speed ratio gear.

  2 after the completion of taking force and gear need to be in the near-control state to expand the outrigger and leveling

  Leveling needs to observe the day pump leg multi-way valve next to the level meter, the pump installed with electronic level meter need to timely observe the level data on the display screen. The supporting leg needs to place the cushion plate, the site must harden processing, the parking is stable, firm, has the good drainage facility, prevents the collapse.

  3 After the concrete pump truck's outrigger unfolds, switch to the remote control state and then open each section of the boom in turn

  4 before taking over the pipes for pumping concrete and construction pump trucks, the pipes shall be carefully checked. If there are any cracks in the pipe wall, leakage, serious wear on the pipe body, damage of joints, etc. , the pipes shall be repaired or stopped from being used, in order to prevent the pressure of concrete, under greater pressure accident. A small amount of mortar is used to lubricate the pipe before pumping by the concrete pump truck. When pumping concrete is poured on site, no one shall stand within 1 meter on both sides of the pipe to prevent the pipe from swinging to hurt people.

   5 After the concrete pump truck is poured, the pipe is washed by the back pump, the suction sponge ball or the clean water.

  Construction safety is greater than days, please be sure to strictly in accordance with the correct flow of concrete pump truck construction operation, in order to avoid accidents